Nov 4, 2008. The waterfall model (Figure 4), the archetypical project cycle model from which
all. In contrast, in an iterative environment, the plan is reviewed and. A major
difference between the linear approaches (the waterfall and Vee.
READ MORE on www.projecttimes.com